The marine grade epoxy material used is a very high-grade epoxy, giving excellent adhesion, high film coverage, and quick dry time. This material is rustproof and waterproof. It was designed specifically for use on properly prepared steel or masonry surfaces, including immersion (non-potable water) service. The epoxy is ideal for cooling towers, structural steel, piping, storage tanks, machinery, and equipment in petroleum refineries, pulp and paper mills, chemical and fertilizer plants, and sewage treatment plants. The epoxy’s exceptionally fast drying time (5 to 7 hrs.) allows equipment to be returned to service quickly. Our customers have found that this epoxy offers exceptional corrosion protection suitable for salt and fresh water immersion, low temperature cure to 0ºF (-18ºC), surface tolerant — abrasive blasting not required, excellent adhesion to tight rust, good adhesion to damp surfaces, self-priming for steel and masonry substrates, abrasion and chemical resistance is excellent, high solids — high film build with low VOC. The epoxy coating will add several years to the life of the towers.

Before wet deck

Before

After wet deck

After

WSC's Best Practice for Cooling Tower Maintenance

Nozzles & Manifolds

Plugged nozzles are a major problem to tower performance Regardless of the strainers or other measures taken to remove or reduce scale, nozzles become the most efficient filter in the system. Header pressure increased by plugged nozzles, will eventually build to point where nozzles will blow out. Then, most of the water will blast through the larger openings created by the missing nozzles starving the remaining nozzles and boring a hole in the fill media

Surface media

Cooling tower fill is the heart of the tower. The rest of the tower just distributes water and air over the fill and captures cool water for the chiller Fill is expensive to replace, so preserve it. Maintain the support channels, replace missing nozzles to avoid blowing it apart and keep it clean with proper chemical treatment and mechanical cleaning.

Your tower performance depends upon proper maintenance

As towers age, efficiency tends to fall-off which influences chiller performance. Summer brings warmer days and greater demand on the chill-water system. Lack of maintenance decreases a tower’s efficiency. That drop in efficiency increases demand for power and water. Both are critical resources that need to be spent wisely.

Scale, silt & debris

Removal should be done at least annually. Areas where water evaporates leaving hard scare behind is cleaned and removed by our maintenance technicians. Air louvers, packing face, wet decks, distribution trays are examples locations that scale and debris grow. “Pay me now or pay me later” is over-used but seems the best way to describe results of poor maintenance

Legionella Pneumophila (LD)

Cooling tower systems are an ideal environment for growth of Legionella. CT drift in the form of aerosols can be easily inhaled. Showers, washstands, sinks, air scrubbers and air handlers can also provide a good growth environment and possible means of transmission. Sediment, sludge, scale and organic materials can harbor the bacterium and promote growth. The formation of a biofilm within a water system is thought to play an important role in harboring and providing favorable conditions in which LD can grow A biofilm is a layer of microorganism contained in a matrix that may form a thin layer of slime on surfaces in contact with water. LD grows within biofilm and within protozoa acting to shield Legionella pneumophila from concentrations of biocides that would otherwise kill or inhibit them when freely suspended in water.

Fans, shafts, motors,belts and bearings

The rotating parts of a cooling tower are no different than any other fans. Treat them accordingly Our technicians are trained and experienced at maintaining the moving parts of cooling towers

WSC is serious about servicing towers

Our technicians physically clean each cooling tower After cleaning, we inspect hot water basins, wet deck, sumps and air inlet louvers for signs of corrosion Our technicians complete a service report on the job ticket that includes comments on the tower’s condition. A copy of the report is given to the customer’s representative and forwarded WaterSystems’ General Manager with service recommendations. For questions regarding your
fume scrubber service
cooling tower service

WSC Marine Grade Epoxy

The marine grade epoxy material used is a very high-grade epoxy, giving excellent adhesion, high film coverage, and quick dry time. This material is rustproof and waterproof. It was designed specifically for use on properly prepared steel or masonry surfaces, including immersion (non-potable water) service. The epoxy is ideal for cooling towers, structural steel, piping, storage tanks, machinery, and equipment in petroleum refineries, pulp and paper mills, chemical and fertilizer plants, and sewage treatment plants. The epoxy’s exceptionally fast drying time (5 to 7 hrs.) allows equipment to be returned to service quickly. Our customers have found that this epoxy offers exceptional corrosion protection suitable for salt and fresh water immersion, low temperature cure to 0ºF (-18ºC), surface tolerant — abrasive blasting not required, excellent adhesion to tight rust, good adhesion to damp surfaces, self-priming for steel and masonry substrates, abrasion and chemical resistance is excellent, high solids — high film build with low VOC. The epoxy coating will add several years to the life of the towers.

Before wet deck

Before

After wet deck

After

Custom Maintenance Programs for Chemical Plants, Semiconductor Facilities & Manufacturing Centers

Core Service Components:

Packing Media Replacement

When Channeling Occurs:
Our Process:
Average project completion: 6-8 hours for standard scrubbers

Vibration Analysis & Fan Balancing

Increasing your systems efficiency and reliability is our goal. We provide vibrabon analysis to predict bearing farflute and belancing farms.

WaterSystems can save you money.

San Francisco Bay Area Certified Technicians
Industrial fume scrubber systems require expert calibration of four critical factors:
Why Regular Maintenance Matters
A 10% imbalance in any parameter can reduce scrubber efficiency by 32% (EPA estimates). Our certified technicians:
Proven Cost Savings
Bay Area manufacturers report 18-25% reduced energy costs after implementing our maintenance programs.
Machines
Cooling Tower Service

Tri-Packs®

Hollow, spherical packings made of injection molded plastic, available in four diameters: 1″, 11/4″ 2″ and 31/2″

Cooling machines

Cooling Tower Surface Media

WaterSystem uses surface fill media designed and engineered to distribute water evenly over the entire fill area for high thermal performance. Integrated inlet louvers and drift eliminators complete this efficient high-performance crossflow media system.

Drift Eliminators

worker checking machines
man working

WSC Tower Fill System

The WSC Tower Fill System includes built-inair intake louvers, surface fill and drift eliminators. Our packing bundles will increase heat transfer efficiency of cooling tower, and extend the tower’s economic life.

The PVC compounds used in fill bundles have outstanding resistance to weather exposure and are nearly impervious to chemical degradation by alkali, acids, grease, fats, oils and biological attacks. PVC also has an excellent fire rating due to its self-extinguishing characteristics and meets or exceeds Cooling Technologies Institute PVC Materials Standards 136.

Cooling Tower service

Tri-Packs®

WSC standard film fill bundles are a PVC 010″ cross-corrugated, edge bonded fill with optimally sized microstructure, dedicated glue points, high surface to volume ratio (48 sq. ft. per cu. ft.) and high thermal performance. This fill is designed for either crossflow or counterflow towers. A.015 film fill is available, along with a 68 sq. ft. per cu. ft. surface area for special applications.

The fill system includes a supports deck designed to keep packing material above the wet deck. This allows the hot water to flow downward more freely through the fill media carrying solids across the wet deck and into the sump. This raised area (approximately 3 to 4 inches) allows water and chemicals to flow underneath the fill bundles during daily operation, as well as during periodic cleaning.

Man checking Cooling Tower Machine

WSC Can Fabricate and Replace Corroded Distribution Pans

Cross flow cooling towers utilize gravity distribution basins to distribute the returned hot water. Gravity systems are mounted on top of the tower directly over the fill media. Spray nozzles placed in the hot water basin to distribute returned water evenly over the surface fill. Constant movement of returned hot water eventually will cause the pan to fail.

Cooling tower service

Rust holes in the sidewalls and basin floors cause the return water to be redirected away from the surface fill. Splash outs, hot spots in the fill media and excessive water drawn into the fan plenum all reduce the tower’s cooling ability. Valuable resources of water and electricity are wasted until a replacement pan is installed. Call WSC today to see if we can contain some cooling tower budget leaks for your company.