Is Your Cooling Tower Costing You
$50K/Year in Wasted Energy?
Restore fouled systems to original design performance.
Guaranteed uptime. ASHRAE 188 compliance.
Avoid premature replacements that waste CapEx budgets.
Restore Peak
Performance
Eliminate efficiency loss from scale and fouling. Get systems back to original design specs. Proven with before and after diagnostics.
Performance
Eliminate efficiency loss from scale and fouling. Get systems back to original design specs. Proven with before and after diagnostics.
Guarantee Uptime
& Compliance
Zero downtime during service. Audit-proof documentation. EPA/OSHA/ASHRAE 188 compliant. Inspector-ready reports delivered within 24 hours.
& Compliance
Zero downtime during service. Audit-proof documentation. EPA/OSHA/ASHRAE 188 compliant. Inspector-ready reports delivered within 24 hours.
Avoid $500K+
Replacements
Performance restoration saves 60-80% vs. capital replacement. Keep assets running at peak efficiency for years longer.
Mission-Critical
Expertise
39 years serving data centers, pharma, hospitals, and industrial facilities. ISN/Avetta verified. Pre-qualified with JLL, CBRE, ABM.
See Real Performance Results
Check our case study
How we restored a failing 271-ton cooling tower, delivering a 10°F performance boost, saving $39K annually, and deferring a $500K replacement.
Review a Sample Compliance Report
See the audit-ready documentation we provide
ATP testing, Legionella analysis, full service records.
Here's What
We Can Do For You
We’ll diagnose exactly how much efficiency you’re losing—and show you what restoration vs. replacement will cost. No obligation. No sales pressure.
Includes:
- System performance diagnostics
- Energy loss calculation ($/year impact)
- Restoration cost vs. replacement analysis
- ASHRAE 188 compliance gap assessment
Approved Vendor Platforms